Construction Inspection Services for Design and Build of the Sábana Grande Wastewater Treatment Plant Elimination

PROJECT OVERVIEW

The scope of work for this project included providing construction inspection and administration service for the elimination of the Sabana Grande Wastewater Treatment Plant. The initiative was procured as a design-build project, with ENTECH at the forefront of its management. The project included the following tasks:

(1) Demolition of the existing wastewater treatment plant,

(2) Construction of a new 3,500 gallons per minute wastewater pump station.

(3) Installation of approximately 5.6 miles of 18-inch diameter main.

  • Project Type Infrastructure (Water / Wastewater)
  • Services Contracted Construction Inspection
  • Owner Puerto Rico Aqueduct and Sewer Authority
  • Client CDM Smith
  • Contract Period 2010
  • Construction Cost $7,500,000.00
  • Location Sabana Grande, Puerto Rico